The Construction Manager-General Contractor method for construction of transportation projects in Puerto Rico
Date
Authors
Advisor
Publisher
Polytechnic University of Puerto Rico
Item Type
Article
- Total Views Total Views1
- Total Downloads Total Downloads33
Abstract
The Transportation infrastructure always needs investment. Fiscal problems at government require the use of innovative solutions
to optimize the use of public funds. The traditional contract method, currently used, increases risks and loss of money. The CM/GC contract method reduces the risks during construction, which enhances project designs. This innovative
contracting method, have good result in other states. The CM/GC was promoted, their implementation was discussed and future projects were identified. If PRHTA makes changes in their code of regulation and obtains the local industry support with a transparent selection method, the CM/GC can be implemented in Puerto Rico with success. Key Terms ⎯ CM/GC; risks reduce;
construction industry; contract innovation.
Description
Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Keywords
Citation
Rivera Sáez, A. D. (2013). The Construction Manager-General Contractor method for construction of transportation projects in Puerto Rico [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.