Case Study Through the Application of Value Engineering – Tunnel Construction
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Polytechnic University of Puerto Rico
Abstract
Value engineering is an effective approach used by many industries that aims to analyze a product or project to optimize it while reducing costs. VE does not just focus on cost reduction; its purpose is functional cost-effectiveness. This project presents the five phases of the VE process: information, creative, evaluation, development, and report applied to a construction project. A case study was performed on a 5-mile stormwater drainage tunnel where the original design includes two different cross-sections to be excavated using a tunnel boring machine. The alternative was proposed by the contractor, and it resulted in a solution that provides the following advantages: improved schedule, cost savings, add functionality, and simplifies operation and maintenance in the long run. This alternative result in a cost-saving of $1.4 million. VE analysis developed by the builder or the contractor adds significant value or advantages to the project due to its expertise in construction methods.
Key Terms ⎯ Cost-Effective, Functionality Value Engineering, TBM, Tunnel Construction
Description
Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Keywords
Citation
Ortiz Reyes. J. L. (2021). Case Study Through the Application of Value Engineering – Tunnel Construction [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.