Production Line Improvement Using DMAIC Tool in an Electrical Production Plant

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

Article
  • Total Views Total Views1
  • Total Downloads Total Downloads3

Abstract

Today, there is much competition between the manufacturers of electronics products. This creates a need for the manufacturers to develop processes that can supply the client demand within a required time and a specified quality. The studied production line had productivity problems, since it was never able to reach the 95% productivity level established by the company, and had a backorder cost of $26K. These factors affected the availability of products required by the customer. Using the DMAIC tool the main factors that affected the production output were properly identified to correct the problem of a production line that did not meet adequately the client demand. The initials stand for: Define Measurement, Analyze, Improve and Control. As a result of working with causes affecting the productivity problems of the studied area, the productivity was increased from 85% to 96.7% and Backorder costs were reduced to $4,300. Key Terms: DMAIC, Sub. assemblies, Molding Parts, 5’S.

Description

Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico

Keywords

Citation

Díaz Marrero, J. E. (2010). Production line improvement using DMAIC tool in an electrical production plant [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.