Steel Sutures Finished Good Test Sampling Optimization Initiative
Date
Authors
Advisor
Publisher
Polytechnic University of Puerto Rico
Item Type
Poster
- Total Views Total Views1
- Total Downloads Total Downloads4
Abstract
Regulated organizations have the challenge to reduce cost and increase value while complying with regulatory mandates. Quality
history, process capability, and life cycle of a given suture produce for a medical device company was used to build a business case to eliminate Finished Good Level testing which will result in waste reduction and cost saving. The level of managerial
interactions at internal and corporate level requires a change management strategy that portrays the need of the organization evolution and risk mitigation plans. Key Terms ⎯ Change management, Finished Good Test, life cycle management, process
capability, sampling plan, sutures.
Description
Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Keywords
Citation
Barreto, Y. E. (2015). Steel Sutures Finished Good Test Sampling Optimization Initiative [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.