Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project

Loading...
Thumbnail Image

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

Article
  • Total Views Total Views1
  • Total Downloads Total Downloads1

Abstract

The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS and Schedule B classification took longer than three days. A process improvement has been made using the Lean-Kaizen methodology. As Lean-Kaizen tools, DMAIC (Define, Measure, Analyze, Improve, and Control) and Value Streaming Mapping (VSM) were worked together to obtain efficient results. As a result, one delay, three waiting times, and seven kaizen bursts were identified. Twelve corrective actions were proposed for process improvement. The future VSM results reflect that the maximum lead and waiting times are reduced from almost 11 days to one day. These time reductions will help with the 50% goal of time reduction proposed for the classification process and the 33% reduction goal for the total turnaround time in the request approval process. Key Terms ⎯ Classification process, Lean-Kaizen, Time reduction, Turnaround time.

Description

Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico

Keywords

Citation

De Leon Lopez, D. P. & Morales Morales, J. A. (2022). Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.