BU2 MIDS LVT
Date
Authors
Advisor
Publisher
Polytechnic University of Puerto Rico
Item Type
Article
- Total Views Total Views1
- Total Downloads Total Downloads18
Abstract
This project studies the considerations,
implications and challenges of implementing a
block upgrade to the link 16 terminals of several
fleets of United States Air Force aircrafts. The
block upgrade will try to incorporate several pieces
of capabilities, but this report centralizes around
the frequency remapping portion, why the
frequency has to be remapped and how will this be
accomplished.
Key Terms - Block Upgrade, Frequency
Remapping, Low Volume Terminal, Multifunctional
Information Distribution System.
Description
Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Keywords
Citation
Trallero, F. C. (2015). BU2 MIDS LVT [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.