Productivity Increase on Manufacturing Line A

dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorGrant Tejada, Maria Victoria
dc.date.accessioned2024-02-20T19:48:59Z
dc.date.available2024-02-20T19:48:59Z
dc.date.issued2022
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractIn company that shall remain anonymous, Manufacturing Line A was underperforming, often falling back in orders. Therefore, the company decided to put in place a project to look at increasing productivity in this high-mix low volume assembly line. After conducting an analysis of historical data, the high runners were selected for the redesign of the assembly line. Time studies were conducted to identify areas of opportunities, and operator interviews took place. Besides increasing productivity, reducing any potential risks was also considered while evaluating the assembly line. Manufacturing Line A was re-designed and post implementation time studies were conducted to validate the increase in productivity. These time studies demonstrated that the daily production output will be increased by 47% if the proper mix of designs are in the schedule. Also, three risk reduction projects were implemented. For the success of this project in the intended timeline, the collaboration and prioritization from all involved departments was instrumental in addition to including the operators as key members of this project. Key Terms ⎯ Design of manufacturing assembly line, Lean manufacturing, resistance to change, time studies.en_US
dc.identifier.citationGrant Tejada, M. V. (2022). Productivity Increase on Manufacturing Line A [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2193
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.haspartSan Juanen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesSpring-2022;
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US
dc.rights.licenseAll rights reserveden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleProductivity Increase on Manufacturing Line Aen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_SP22_MEM_Maria Victoria Grant Tejada _Article.pdf
Size:
150.82 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_SP22_MEM_Maria Victoria Grant Tejada _Article
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_SP22_MEM_Maria Victoria Grant Tejada _Poster.pdf
Size:
281.82 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_SP22_MEM_Maria Victoria Grant Tejada _Poster

License bundle

Now showing 1 - 1 of 1
License Image
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections