Process Improvement of Equipment Support Project Requests

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

Article
  • Total Views Total Views1
  • Total Downloads Total Downloads4

Abstract

A project request package moves through five different departments: Pre-Induction, Engineering Design, Planning, Material and Execution. The project request package is constantly returned to a previous department for rework. Engineering design drawings are the most recurring returns, therefore improvement efforts of this project were focused on how to set guidelines for the engineering design department to provide complete, comprehensive and quality drawings the first time. A Drawing Checklist was designed by a team made up of engineers, planners, schedulers and craft shop supervisors that will ensure quality drawings with accurate measurements and materials. Key Terms ⎯ DMAIC, Guidelines, Quality, Recurrence.

Description

Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico

Keywords

Citation

García Miranda, N. (2020). Process Improvement of Equipment Support Project Requests [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.

Collections