Optimize Batch Transfer between Processing Tanks

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

Article
  • Total Views Total Views1
  • Total Downloads Total Downloads6

Abstract

Estimates indicate that Diabetes will increase affecting the population worldwide in the future. To mitigate current and future demand, Barceloneta’s Factory 2 needs to improve the MK-0431 manufacturing process. Several stages in the manufacturing process have been identified for improvement. This project focuses in the optimization of the batch transfer between vessels. Six Sigma tools and methodologies (Define, Measure, Analyze, Improve and Control) were utilized to identify the problem and improve the process. As a result we were able to optimize the batch transfer process, reducing the cycle time of the vessel and helping the MK-0431’s train ability to increase its manufacturing capacity. Key Terms: Cycle Time, DMAIC, Prioritization Matrix, Process Baseline.

Description

Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico

Keywords

Citation

Felipe, Agustin. (2012). Optimize Batch Transfer between Processing Tanks [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.