Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5%
| dc.contributor.advisor | Cruzado Vélez, Héctor J. | |
| dc.contributor.author | de Jong Van der Heide, Andries A. | |
| dc.date.accessioned | 2024-03-25T14:36:23Z | |
| dc.date.available | 2024-03-25T14:36:23Z | |
| dc.date.issued | 2020 | |
| dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
| dc.description.abstract | Productivity is the most significant factor in manufacturing industries. Low productivity of workers can have a great impact in the finances of an organization. In this project paper, the focus is to improve the manufacturing productivity of Company X, particularly the Injection Molding Department of a Medical Devices Company. Data from daily operations was collected and analyzed finding that the low productivity was caused by rework performed on stock number x due to embedded particle matter caused by the mold manifold. After implementation and validation of a new mold manifold, embedded particle matter was eliminated, and the productivity was increased by 12.2%. During this project, rework was found as the cause and is one of the factors that affects productivity greatly, but other areas were identified as well that can be improved to increases even more the value of productivity obtained. KeyTerms⎯Injection Molding, Manufacturing Operations, Productivity Management, Productivity Improvement. | en_US |
| dc.identifier.citation | de Jong Van der Heide, A. A. (2020). Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5% [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
| dc.identifier.uri | http://hdl.handle.net/20.500.12475/2328 | |
| dc.language.iso | en | en_US |
| dc.publisher | Polytechnic University of Puerto Rico | en_US |
| dc.relation.haspart | San Juan | en_US |
| dc.relation.ispartof | Management; | |
| dc.relation.ispartofseries | Fall-2020; | |
| dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
| dc.rights.license | All rights reserved | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Subject headings--Unassigned | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degree | en_US |
| dc.title | Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5% | en_US |
| dc.type | Article | en_US |
Files
Original bundle
1 - 2 of 2
Loading...
- Name:
- PUPR_CEAH_SJU_FA20_MEM_Andries De Jong_Article.pdf
- Size:
- 229.31 KB
- Format:
- Adobe Portable Document Format
- Description:
- PUPR_CEAH_SJU_FA20_MEM_Andries De Jong_Article
Loading...
- Name:
- PUPR_CEAH_SJU_FA20_MEM_Andries De Jong_Poster.pdf
- Size:
- 352.58 KB
- Format:
- Adobe Portable Document Format
- Description:
- PUPR_CEAH_SJU_FA20_MEM_Andries De Jong_Poster
License bundle
1 - 1 of 1
- Name:
- license.txt
- Size:
- 1.63 KB
- Format:
- Item-specific license agreed upon to submission
- Description: