Improving Integration of External Contractor Activities into the Lead Maintenance Activity Integrated Production Schedule
Date
Authors
Advisor
Publisher
Polytechnic University of Puerto Rico
Item Type
Poster
- Total Views Total Views0
- Total Downloads Total Downloads4
Abstract
This project evaluated the integration of external contractor activities into the Lead Maintenance Activity Integrated Production Schedule at FDRMC Rota to improve compliance with NAVSEA Standard Item 009-060, using the DMAIC methodology. Baseline analysis showed contractor integration performance was approximately 60%, significantly below the 95% target. Pareto and Fishbone analyses identified late submissions, deficient data quality, missing logical relationships, and lack of a centralized Work Integration Manager role as the primary contributors to integration deficiencies. A structured improvement framework was developed to improve schedule visibility, coordination, and long-term compliance.
Description
Graduate Project Poster for the Graduate Programs at the Polytechnic University of Puerto Rico summarizing graduate research through concise text and visuals.
Keywords
Citation
Montes La Santa, W. (2026). Improving Integration of External Contractor Activities into the Lead Maintenance Activity Integrated Production Schedule [Graduate project poster]. Graduate School, Polytechnic University of Puerto Rico. Puerto Rico Cloud Repository (PRCR). https://hdl.handle.net/20.500.12475/3331