Improving Production Fixture Availability Using Lean and Six Sigma in a Medical Device Manufacturing Line

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

Article
Poster
  • Total Views Total Views4
  • Total Downloads Total Downloads0

Abstract

This design project addressed the problem of production fixture unavailability in a medical device manufacturing line, where missing, misplaced, or delayed fixtures generated avoidable downtime and process interruptions. The main objective was to improve fixture availability and reduce fixture-related downtime through the application of Lean and Six Sigma principles. The methodology followed an applied, non-experimental, observational approach using historical downtime records, fixture usage logs, direct observations, process mapping, cause-and-effect analysis, and statistical evaluation of key performance indicators. The results showed that missing fixtures, misplaced fixtures, and waiting for fixture return were the most frequent baseline causes. Comparative analysis between baseline and post-improvement conditions showed a reduction in mean downtime from 37.53 to 13.53 minutes, a reduction in interruptions from 4.40 to 1.73, and an increase in fixture availability from 80.93% to 95.00%. These findings support the conclusion that a structured fixture management strategy can improve operational efficiency and process stability.

Description

Design Project Article for the Graduate Programs at the Polytechnic University of Puerto Rico. Includes a graduate project poster summarizing the research through concise text and visuals derived from the same study.

Keywords

Fixture Availability, Lean Six Sigma, Medical Device Manufacturing, Production Downtime

Citation

Figueras Toro, J. (2026). Improving Production Fixture Availability Using Lean and Six Sigma in a Medical Device Manufacturing Line [Graduate project poster]. Graduate School, Polytechnic University of Puerto Rico. Puerto Rico Cloud Repository (PRCR). https://hdl.handle.net/20.500.12475/3386