The Insufficient Capacity of the HVAC system in the original GMD Building of Collier County

dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorGoicoechea Lamoutte, Leandro A.
dc.date.accessioned2024-05-21T11:57:07Z
dc.date.available2024-05-21T11:57:07Z
dc.date.issued2016
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractCollier County is located in the Southwest of Florida. The Collier family constructed the Growth Management Division Building in 1989, which was bought by the County to establish government offices. Through the years, visitors and employees have complaint of drastic temperature fluctuations in areas of the building. Investments are made annually by replacing rooftop units without success. A mechanical engineer is contracted to study the situation, verify complaints and solve the problem. Analysis and studies concluded that the original installation of the heating, ventilating and air conditioning system was deficient, and improvements made to the offices also have affected its capacity. A new design of a heating ventilating and air conditioning system occurred and rooftop units are replaced by air cooled chillers due to ease of maintenance and City code regulations. Construction will occur during the night, so public services will not be affected. Employees and directors are aware of possible inconveniences. Key Terms ⎯ Growth Management Building; HVAC; Chillers; Rooftop Units; Collier County.en_US
dc.identifier.citationGoicoechea Lamoutte, L. A. (2016). The Insufficient Capacity of the HVAC system in the original GMD Building of Collier County [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2536
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.haspartSan Juanen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesFall-2016;
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US
dc.rights.licenseAll rights reserveden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleThe Insufficient Capacity of the HVAC system in the original GMD Building of Collier Countyen_US
dc.typePosteren_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_FA16_MEM_Leandro Goicochea_Poster.pdf
Size:
184.18 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_FA16_MEM_Leandro Goicochea_Poster
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_FA16_MEM_Leandro Goicochea_Article.pdf
Size:
101.71 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_FA16_MEM_Leandro Goicochea_Article

License bundle

Now showing 1 - 1 of 1
License Image
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections