Substation Transformer Replacement Plan
| dc.contributor.advisor | Cruzado Vélez, Héctor J. | |
| dc.contributor.author | Sanchez, Josue | |
| dc.date.accessioned | 2024-03-11T18:50:24Z | |
| dc.date.available | 2024-03-11T18:50:24Z | |
| dc.date.issued | 2021 | |
| dc.description | Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico | en_US |
| dc.description.abstract | About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured using an asset management software, called Cascade. The health of each power transformers was measured by multiple criteria such as gassing, hazard factor, age, customer count, percent of loading, switch ability, priority customer factor and fault count. These factors were combined and weighted using a Risk Priority Numbers (RPN) that provided a total risk of failure value. From a total of 52 power transformers, the utility found as a result 32 power transformers with high risk of failure. Energy Supply manage 18 of those transformers and Energy Delivery manage 14 of those transformers. It was recommended and planned to start developing the engineering and procurement process to replace these transformers based on the risk priority and the operations configuration of the system. Key Terms ⎯ Electric Energy, Power Transformers, Substations, Utilities. | en_US |
| dc.identifier.citation | Sanchez, J. (2021). Substation Transformer Replacement Plan [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico. | en_US |
| dc.identifier.uri | http://hdl.handle.net/20.500.12475/2250 | |
| dc.language.iso | en | en_US |
| dc.publisher | Polytechnic University of Puerto Rico | en_US |
| dc.relation.haspart | San Juan | en_US |
| dc.relation.ispartof | Management; | |
| dc.relation.ispartofseries | Winter-2021; | |
| dc.rights.holder | Polytechnic University of Puerto Rico, Graduate School | en_US |
| dc.rights.license | All rights reserved | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Research | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Subject headings--Unassigned | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate students--Posters | en_US |
| dc.subject.lcsh | Polytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degree | en_US |
| dc.title | Substation Transformer Replacement Plan | en_US |
| dc.type | Article | en_US |
Files
Original bundle
1 - 2 of 2
Loading...
- Name:
- PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Article.pdf
- Size:
- 177.13 KB
- Format:
- Adobe Portable Document Format
- Description:
- PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Article
Loading...
- Name:
- PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Poster.pdf
- Size:
- 430.12 KB
- Format:
- Adobe Portable Document Format
- Description:
- PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Poster
License bundle
1 - 1 of 1
- Name:
- license.txt
- Size:
- 1.63 KB
- Format:
- Item-specific license agreed upon to submission
- Description: