Substation Transformer Replacement Plan

dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorSanchez, Josue
dc.date.accessioned2024-03-11T18:50:24Z
dc.date.available2024-03-11T18:50:24Z
dc.date.issued2021
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractAbout half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured using an asset management software, called Cascade. The health of each power transformers was measured by multiple criteria such as gassing, hazard factor, age, customer count, percent of loading, switch ability, priority customer factor and fault count. These factors were combined and weighted using a Risk Priority Numbers (RPN) that provided a total risk of failure value. From a total of 52 power transformers, the utility found as a result 32 power transformers with high risk of failure. Energy Supply manage 18 of those transformers and Energy Delivery manage 14 of those transformers. It was recommended and planned to start developing the engineering and procurement process to replace these transformers based on the risk priority and the operations configuration of the system. Key Terms ⎯ Electric Energy, Power Transformers, Substations, Utilities.en_US
dc.identifier.citationSanchez, J. (2021). Substation Transformer Replacement Plan [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2250
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.haspartSan Juanen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesWinter-2021;
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US
dc.rights.licenseAll rights reserveden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleSubstation Transformer Replacement Planen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Article.pdf
Size:
177.13 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Article
Loading...
Thumbnail Image
Name:
PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Poster.pdf
Size:
430.12 KB
Format:
Adobe Portable Document Format
Description:
PUPR_CEAH_SJU_WI21_MEM_Josue Sánchez_Poster

License bundle

Now showing 1 - 1 of 1
License Image
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections