Optimization of Manufacturing Space and Lead Time for a Medical Devise Process Line

Date

Publisher

Polytechnic University of Puerto Rico

Item Type

  • Total Views Total Views2
  • Total Downloads Total Downloads3

Abstract

Product Availability and inventory management are key metrics for every company in order to meet customer satisfaction and cost reduction. For this company this are two important metric in addition to space utilization, Product availability is a direct relation between the customer and the company, inventory management and space utilization is related to improve costs of the company and help them to be more competitive. In this case, this family of product was identified whit that opportunities areas in order to improve a strategy to implement Lean Six Sigma methodology were generated on plant. Implementing a cell manufacturing, one piece flow, standardization, helped company to reduce lead time by 81%, reduce inventory level by 42% and improve space utilization by 52%. Lean Six Sigma strategy promotes a continuous improvement culture on the place where was implemented, that help any company to obtain a continuous grow.

Description

Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Incluye la obra Realm of the Sens, Roberto Silva Ortíz. Óleo sobre tela. 2012

Keywords

Citation

García Rivera, Carmen M. (2018). Optimization of manufacturing space and lead time for a medical devise process line. Politechne, 19(1), 17-26.