Cycle time reduction in an administrative process using Six-Sigma tools
Date
Authors
Advisor
Publisher
Polytechnic University of Puerto Rico
Item Type
Article
- Total Views Total Views1
- Total Downloads Total Downloads2
Abstract
The long cycle time in the outsourcing process of niche skill set has been an obstacle for program execution and customer delivery. The administrative process was addressed with the use of Six Sigma tools to reduce waste and cycle time. It was segregated into two phases: Phase 1 – Standardize the process with documentation, training and procedures and Phase 2 – Systematic changes to automate. Because of the use of Six Sigma tools, the cycle time was reduced from 32 days to 23.75 days, on average to date. Lastly, the deliverables include standard documents, training package and standard procedure. Key Terms ⎯ Six Sigma green belt, Process Improvement, Process Waste reduction.
Description
Design Project Article for the Graduate Programs at Polytechnic University of Puerto Rico
Keywords
Citation
Sanchez, E. J. (2020). Cycle time reduction in an administrative process using Six-Sigma tools [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.