Packaging Improvement Time at Mini Bimbo Production Line Holsum de Puerto Rico, Inc.

dc.contributor.authorRodríguez Casanova, Juan B.
dc.date.accessioned2025-03-17T16:07:32Z
dc.date.issued2014
dc.descriptionFinal research poster for the senior design project.
dc.description.abstractThe project will be divided by chapters and use the methodology of Lean Six Sigma “DMAIC”, which comprise define, measure, analyze, improve and control of packaging improvement time at Mini Bimbo Production Line of Holsum de Puerto Rico, Inc. The Company Holsum has a need to improve the packaging time of the mini bimbos that are consuming time and space. The mini bimbo production line is divided in two areas: Make-Up Area and Wrapping Area. The Make-Up Area is where the ingredients of the products are made and bake. The Wrapping Area is where the products are taken to wrap and sealed to be deliver. The objectives of this projects is to reduce the time delay of packaging this product to at least 10% Packaging Improvement Time at Mini Bimbo Production Line Capstone 1 Project – Define Phase 8 In addition there is an interest in improving the flow of the production process to reduce or eliminate any activities that are unnecessary or do not add value. The goal is to meet the company's expectations for improvement to achieve reductions in waste and streamlining the process.
dc.identifier.citationRodríguez Casanova, J. B. (2014). Packaging Improvement Time at Mini Bimbo Production Line Holsum de Puerto Rico, Inc. [Research Poster]. Industrial and Systems Engineering Department, Polytechnic University of Puerto Rico.
dc.identifier.urihttps://hdl.handle.net/20.500.12475/2952
dc.language.isoen
dc.publisherPolytechnic University of Puerto Rico
dc.relation.haspartSan Juan
dc.relation.ispartofIndustrial and Systems Engineering Program
dc.relation.ispartofseriesIndustrial and Systems Engineering Department; Spring-2014
dc.rights.holderPolytechnic University of Puerto Rico, Industrial and Systems Engineering Department
dc.rights.licenseAll rights reserved
dc.subject.lcshPolytechnic University of Puerto Rico--Industrial and Systems Engineering Department--Undergraduates--Research--Capstone Design Project
dc.subject.lcshPolytechnic University of Puerto Rico--Industrial and Systems Engineering Department--Curricula--IE 5905-Capstone Design Course Extension
dc.subject.lcshSix sigma (Quality control standard)
dc.subject.lcshTime management
dc.subject.lcshPackaging
dc.subject.lcshPolytechnic University of Puerto Rico--Undergraduates--Posters
dc.titlePackaging Improvement Time at Mini Bimbo Production Line Holsum de Puerto Rico, Inc.
dc.typePoster

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PUPR_SJU_CEAH_BSIE_Capstone_SP2014 _Rodríguez, Juan_Poster.pdf
Size:
7.6 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: